21 DC fast chargers in Tennessee have a Hardee's within a 10-minute walk, shortest walk first.
Open on the map →Of the 21 fast chargers with a Hardee's nearby in Tennessee: The typical stop here delivers 250 kW, and 16 of them do 150 kW or more; 5 are close enough that the Hardee's is a two-minute walk or less; 18 are listed as open 24 hours. The fastest is Athens Ub Station 2 (M) in Athens at 400 kW; the closest walk is 1 min at 714 New Hwy. Most are on ChargePoint (7), Tesla Supercharger (4), EV Connect (3).
How many of each drive’s fast chargers in Tennessee have a Hardee's within a walk:
21 public DC fast chargers in Tennessee have a Hardee's within a 10-minute walk (800 m), based on US Department of Energy charger data matched against OpenStreetMap locations.
Athens Ub Station 2 (M) in Athens at 400 kW.
Most are CCS or have CCS alongside NACS. Set your car in the map view and it will show connector compatibility and an estimated charge time for each stop. Tesla Supercharger sites additionally have to be open to your brand.
They are minimums: straight-line distance at about 3 mph. The real walk is usually longer because you have to follow paths and crossings.