The drive is 305.8 miles, about 5h 47m. Along it sit about 108 DC fast chargers within 5 miles of the route — and 93 of those have somewhere to eat within a 10-minute walk, so the charging stop and the meal are the same stop.
Open this drive in the app →Leave Philadelphia at 8:00 am, take a break in Newburg at 10:45 am, stop for lunch in Somerset at 12:45 pm and arrive in Pittsburgh around 2:45 pm.
| When | Where | Charger | Food within a walk |
|---|---|---|---|
| 8:00 am | Leave Philadelphia, PA | ||
| 10:45 am Break · mile 144 | Newburg, PA Blue Mountain Service Plaza | 400 kW 4 stalls | ☕ Starbucks 1 min |
| 12:45 pm Lunch · mile 235 | Somerset, PA South Somerset Service Plaza | 400 kW 4 stalls | 👑 Burger King 1 min, 🍗 Popeyes 1 min, 🍩 Dunkin' 1 min |
| ~2:45 pm | Arrive in Pittsburgh, PA |
Meals fall near their local hour (times are local at each stop), with about 20 minutes for a break and 40 for a meal. It is a driver’s plan, not a charging plan: where you need to charge depends on your car. Open this drive in the app to pick another leaving time.
Typical power along this route is 250 kW, with 79 stops at 150 kW or more and 33 on the Tesla network. Chargers under 50 kW are left out of the list — on a drive this length they cost more time than they save. Counting every DC fast charger, there is one at least every 33 miles of the way.
In order along the route — the strongest stop in each stretch of the drive, so the list covers the whole route rather than filling up with the city you left.
Leaving Philadelphia at 8:00 am, lunch falls in Somerset, PA around 12:45 pm, where Burger King is a 1-minute walk from a 400 kW charger. The break in Newburg, PA at 10:45 am has Starbucks 1 min from the charger. In all, 93 of the roughly 108 fast chargers along the way have a restaurant within a 10-minute walk.
About 108 DC fast chargers are within 5 miles of the 306-mile route, 105 of them 50 kW or more. 79 charge at 150 kW or more, 33 are on the Tesla network, and 93 have a restaurant within a 10-minute walk.
33 miles, between mile 201 (Bedford, PA) and mile 234 (Somerset, PA), with no DC fast charger within 5 miles of the route.
Counting the fast chargers of 50 kW or more on the route, the chains most often within a 10-minute walk are Starbucks (near 42 chargers), Dunkin' (39), McDonald's (37), Wendy's (27), Taco Bell (21) and Burger King (20).
It depends on the car. The app's estimate for a 10–80% charge is about 23 min for a Tesla Model Y at the 400 kW charger in Newburg, PA; about 45 min for a Ford Mustang Mach-E at the 400 kW charger in Newburg, PA; about 25 min for a Hyundai Ioniq 5 at the 400 kW charger in Newburg, PA. These are rough figures from each car's battery size and peak charging speed; a cold battery or a busy site takes longer.
About 5h 47m of driving for 306 miles. Leaving at 8:00 am with the plan's 1 break of about 20 minutes and 1 meal of about 40, you arrive around 2:45 pm.